Twoop|Betws-yn-Rhos
NewsEventsLive MusicDealsDirectoryCommunitySkilled LocalsRoadworksPlanningCouncilTrainsBusesAbout
  1. Twoop
  2. Wales
  3. Betws-yn-Rhos
  4. Post

Twoop: Betws-yn-Rhos

Local news, events, deals, and community updates for Betws-yn-Rhos.

Betws-yn-Rhos

  • News
  • Events
  • Deals
  • Community Board
  • Business Directory
  • Skilled Locals

Explore

  • Wales area
  • All communities
  • Twoop home

Get Involved

  • Submit an Event
  • Share a Post
  • Register as a Local
  • About Betws-yn-Rhos
© 2026 Twoop. All rights reserved.
  • Home
  • News
  • Events
  • Directory
  • Community
Back to Planning
Planningvia Conwy Council Planning

Approval of condition no 3 (Written Method Statement) of Listed Building Consent 0/52184 (The reinstatement of floors...

3 July 2026

Approval of condition no 3 (Written Method Statement) of Listed Building Consent 0/52184 (The reinstatement of floors and roofs in the East Wing and West Wing, which is referred to as Application 02.

Approval of condition no 3 (Written Method Statement) of Listed Building Consent 0/52184 (The reinstatement of floors and roofs in the East Wing and West Wing, which is referred to as Application 02. The works comprise: - Conservation-led repair works and removal of high-level vegetation - Localised re-pointing in lime mortar, based on recent trials and evidence - New roof structure, combining a mix of traditional and contemporary structural elements, including integration of insulation - Reinstatement of roof finishes. Gutters are increased in capacity to reflect current rainfall and storm events. - New rainwater goods. These will involve a combination of lead chutes/overflows (through parapets), cast iron hoppers and downpipes - Conservation of the remaining floors and reinstatement of floors where missing - Recording and retention of remaining plasterwork and joinery elements, and consequently holding/conservation works where required - New below ground drainage connections (as indicated on drainage plan) - Holding/conservation works to the existing window frames and temporary glazing to windows, with some localised reinstatement - No foul drainage is proposed as part of these works (Listed Building Consent) Address: Gwrych Castle Llanddulas Road Abergele LL22 8ET Ref: 0/53525 Type: Discharge of Conditions Status: REGISTERED Ward: Gele and Llanddulas
Read full article at Conwy Council Planning

Comments

No comments yet. Be the first to share your thoughts!